- Square Footage: 16,500
- Client: Local advocates led by the Razo Family
- Design Completion: March 2023
When Vermont’s first town set out to build a skatepark, Platform Group delivered a design tailored to the community’s needs. During the warmer months, the open-air snake run and street course offer dynamic terrain and features suited to skaters of every skill level. As the seasons change, this concept has you covered, literally, with an enclosed bowl that ensures the park remains rideable in rain, sleet, or snow. This design was created for the advocate group as a tool to build local support. Their efforts ultimately worked, as the project went out to bid, with the final design and construction being handled by Grindline Skateparks.
