Builds

A collection of build work that we've done over the years.

Ocala Skatepark Phase 2 Expansion

Ocala Skatepark Phase 2 Expansion

3/6/2025

Ocala Skatepark Phase 2 is coming to life. The current design, recently approved by the City of Ocala, is about creating strong connections to existing features, allowing for the integration of new elements into the existing context, while complementing and enhancing their surroundings.

Tags: Builds, Designs

Design/Build in Marathon, Florida

Design/Build in Marathon, Florida

3/3/2025

  • Square Footage: 16,000
  • Partners: Civil Engineer, Allen Perez with Perez Engineering & Development
  • Project Completion: Late 2025

Marathon, FL is about to get the southernmost custom concrete skatepark in the United States. We are privileged to be working alongside the City of Marathon on their park renovation and incorporating not only a new skatepark design, but all supporting features as well.

Tags: Builds, Designs

Design/Build in Hayden, Colorado

Design/Build in Hayden, Colorado

2/28/2025

  • Square Footage: 14,400
  • Partners: Phantom Concrete
  • Project Completion: Spring 2025
Hayden is part of the Yampa Valley in Colorado and sits at 7,000 ft elevation. The nearest town, Steamboat Springs, is an Olympic training mecca. Hayden is known for housing staff and family for the area.

Tags: Builds, Designs

Troy, Ohio Wood Design and Build

Troy, Ohio Wood Design and Build

12/18/2024

  • Square Footage: Smaller scale remodel of individual custom obstacles at an existing pre-fab skatepark
  • Partners: Allen Russell
  • Project Completion: December 2024
We’re more than just concrete! When the City of Troy, Ohio needed a temporary fix for the aging Joe Reardon Skatepark, Platform Group was happy to take on the project. While a long-term concrete skatepark replacement plan is still in the works, we stepped in to support the local community by designing and building some custom wood obstacles. Platform is proud to be part of keeping the scene thriving in Troy!

Tags: Builds, Designs

Design/Build in Charlotte, North Carolina for APB

Design/Build in Charlotte, North Carolina for APB

10/1/2023

  • Square Footage: 4,000
  • Partners: BLDRS, Nor’Easter
  • Project Completion: October 2023
APB reached out to Platform Group for a unique project, bringing together the public and private space. Our challenge was to maximize on a small footprint and create an engaging and safe space for the local youth and skateboarding community.

Tags: Builds, Designs

A Design and Build with Woodward and BLDRS

A Design and Build with Woodward and BLDRS

4/24/2023

We recently had the pleasure of working with Mike Roebke of BLDRS to design and build a new street course at Woodward Skate Camp.

Tags: Builds, Designs

Platform Logo

© 2025 Platform Group, LLC. All rights reserved

Platform

AboutProjectsBlog

Contact and RFPs

info@platformgroup43.com