Skatepark Repair Recommendations for Hillsborough County, FL

Skatepark Repair Recommendations for Hillsborough County, FL

7/24/2025

  • Square Footage: Three skateparks at a total of 38,500
  • Partners: Moreno Industries, Roque’s Concrete and Construction
  • Project Completion: Consulting, October 2023 - Repairs, Summer 2024
Platform was contacted by Hillsborough County for consultation on repairs needed at some of our local skateparks.

Tags: Builds

Final Plans Delivered for Ocala Skatepark Phase Two Expansion

Final Plans Delivered for Ocala Skatepark Phase Two Expansion

3/6/2025

Ocala Skatepark Phase 2 is coming to life. The current design, recently approved by the City of Ocala, is about creating strong connections to existing features, allowing for the integration of new elements into the existing context, while complementing and enhancing their surroundings.

Tags: Builds, Designs

From Concept to Completion: Marathon, FL

From Concept to Completion: Marathon, FL

3/3/2025

  • Square Footage: 16,000
  • Partners: Civil Engineer, Allen Perez with Perez Engineering & Development
  • Project Completion: Late 2025

Marathon, FL is about to get the southernmost custom concrete skatepark in the United States. We are privileged to be working alongside the City of Marathon on their park renovation and incorporating not only a new skatepark design, but all supporting features as well.

Tags: Builds, Designs

From Concept to Completion: Hayden, CO

From Concept to Completion: Hayden, CO

2/28/2025

  • Square Footage: 14,400
  • Partners: Phantom Concrete
  • Project Completion: Spring 2025
Hayden is part of the Yampa Valley in Colorado and sits at 7,000 ft elevation. The nearest town, Steamboat Springs, is an Olympic training mecca. Hayden is known for housing staff and family for the area.

Tags: Builds, Designs

From Concept to Completion: Troy, OH Wood Design and Build

From Concept to Completion: Troy, OH Wood Design and Build

12/18/2024

  • Square Footage: Smaller scale remodel of individual custom obstacles at an existing pre-fab skatepark
  • Partners: Radbuildr
  • Project Completion: December 2024
We’re more than just concrete! When the City of Troy, Ohio needed a temporary fix for the aging Joe Reardon Skatepark, Platform Group was happy to take on the project. While a long-term concrete skatepark replacement plan is still in the works, we stepped in to support the local community by designing and building some custom wood obstacles. Platform is proud to be part of keeping the scene thriving in Troy!

Tags: Builds, Designs

From Concept to Completion: Charlotte, North Carolina for APB

From Concept to Completion: Charlotte, North Carolina for APB

10/1/2023

  • Square Footage: 4,000
  • Partners: BLDRS, Nor’Easter
  • Project Completion: October 2023
APB reached out to Platform Group for a unique project, bringing together the public and private space. Our challenge was to maximize on a small footprint and create an engaging and safe space for the local youth and skateboarding community.

Tags: Builds, Designs

From Concept to Completion: Woodward and BLDRS

From Concept to Completion: Woodward and BLDRS

4/24/2023

We recently had the pleasure of working with Mike Roebke of BLDRS to design and build a new street course at Woodward Skate Camp.

Tags: Builds, Designs